CEMS provided architectural, civil, structural, electrical, and mechanical engineering design to support the construction of the new The Athletic Performance Center which will be a new facility to provide student athletes with state of the art training equipment and team meeting rooms. The new facility includes: a 5,000 SF weight room, nutrition bar, 126 person meeting room, multiple smaller conference rooms, audio/visual room, offices and restrooms. The facility will be constructed as a pre-engineered metal building using insulated metal panels that coordinate with the existing adjacent stucco buildings. Large storefront windows and glazed garage doors are located around the weight room for natural daylighting. An operable partition located in the large meeting room allows for space flexibility for teams of various sizes.

Location
N. Charleston
State
South Carolina
Markets
  • education